EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Serg
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (110)
Research
Workshop
- (3)
Empennage
- (4)
Fuselage
- (62)
Firewall
- (5)
Tail Feathers
Wings
- (10)
Controls
- (10)
-
Rudder cables
-
Throttle quadrants
-
Rudder control
-
Flap cable
-
Pulleys
-
Pulley guards
-
Stick carrier
-
Stick carrier
-
Flap handle
-
Brake pedals
Avionics
Lighting
Instrument Panel
Landing Gear
- (8)
Engine
Propeller
Fuel System
- (4)
Interior Finish
- (4)
Paint / Decals
Inspection
Tools
Builder Name:
Sergio Desiati
-
Project:
Bearhawk - Patrol
-
VIEW REPORTS
Total Hours:
285.2
Start/Last Date:
Aug 31, 2019 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=Serg
Home or Last Project Picture
Oct 21, 2019
Stick carrier
- (2.3 hours)
Category: Controls
Finished installing stick carrier, and connected to primary elevator pushrod. Nut and bolt clearance inside stick carrier was very tight and required cutting and drilling bolts to custom length. I am very happy with the outcome.
121B2132-073B-4763-856A-937686DD0D47.jpeg
2DE3A71E-B32C-4E34-A8DD-1B4D93FCD3BD.jpeg
B530BA29-F3F3-46C6-AFAC-460665859EE2.jpeg
C7687028-09CF-49AC-AA85-355CD14FE2E1.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.